HEALTH AND BIOMEDICAL SCIENCES BUILDING (OPTOMETRY)
Major progress is being made on the
Health and Biomedical Sciences
Building. The next major step in the
process is a concrete pour of a slab
and associated work that will
connect the new and old buildings.
Therefore, it will be necessary for
the contractors to temporarily close
the area on the Calhoun side of the
building, which is now being used to
access the front door entry to the
University Eye Institute lobby.
Effective Saturday, June 25th, 2011,
the entry to Optometry will be
through:
- Existing fire door which is in the staircase in the Family Practice Service and which opens onto Calhoun. A new sidewalk will be built to allow students, faculty and staff to use this door when entering and exiting the building.
- Double glass doors located near the maintenance trailer.
- Sliding glass door near the Optometry building elevators.
Please see the update of
the Contractor�s Site Logistic Plan
below.
The entry path to the Optometry
building is highlighted in red.
Please contact Frederick Maddox,
Senior Project Manager FPC, if you
have questions related to this
project at
fmaddox@central.uh.edu or
by phone at 713-743-1245.