Minor & Planned Projects Listing

Below is a listing of projects over $250,000 managed by Minor & Planned Projects. For a complete list of projects, contact Minor & Planned Projects at 713-743-5919.

To sort the columns click on the headers.
BuildingProjectProj. ManagerBudgetSubst. CompStatusDepartment
AD Bruce Religion Center 562 and University Center Satellite 567 Capital Plan Vail $4,860,000 TBD Needs Development BRC/UCS
Alumni Center / Athletic Center 573/574 Replace Fire Alarms Simmons $490,572 09/26/13 Construction ALUM/ATH2
Bauer Honors Commons 528 Bauer Honors Renovation Galvan $490,000 10/04/13 Selection of Contractor Business
Bayou Oaks Apartments 500 Bayou Oak Renovations Prochaska $1,700,000 12/06/13 Construction RLH
Campus Wide Cullen Fields Renovation Warner $710,000 TBD Selection of Design CRWC
Campus Wide Life Safety Simmons $800,000 TBD Scope Development Campus
Computing Center 596 Install New Chilller 250T Oliver $433,125 11/12/13 Selection of Contractor Computing Center
CRWC 522 Natatorium / Electrical? HVAC Upgrade Galvan $303,500 10/01/14 Scope Development CRWC
Cullen College of Engineering 1 597 Fire Suppression Pump Installation Oliver $2,779,065 06/12/14 Design Engineering
Cullen College of Engineering 1 597 New Air Handler Installation Oliver $1,471,808.43 12/03/13 Design CCOE
Cullen College of Engineering 1&2, Science & Research 1, 2, University of Houston Science Center, J. Armistead, Science & Research Center / Classrooms 499 EHS Safety Shower & Eyewash Installations: In Seven (7) buildings (D-1/579, 550, 551, D-3/581, 593, 505 & 545) replace nonworking units and provide additional new units as required Tolbert $442,985 01/27/14 Selection of Contractor Research Buildings
Energy Research Park 14B Superconducting wire pilot manufacturing facility Tolbert $651,000 TBD Construction Real Estate
Energy Research Park 15 Lab Buildout - Energy Device Fabrication Lab Tolbert $3,644,695 12/31/13 Construction Provost
Energy Research Park 8 ERP (Bldg.8) - Storage Building Improvements Tolbert $325,000 09/27/13 Construction ERP, Real Estate Services
Energy Research Park Annex 19A Building 19A - 1st Flr. Warehouse Annex Office Upgrade Tolbert $507,432 09/26/13 Selection of Contractor ERP
Energy Research Park Annex 19A Building 19A - 2nd Flr. Warehouse Annex Office Upgrade Tolbert $700,000 03/28/14 Selection of Contractor ET
Farish Hall 587 Asian American Studies Suite Upgrade Vail $520,000 02/12/14 Design Asian Studies
Farish Hall 587 Restrooms Renovation Burks $368,451 02/12/14 Selection of Contractor FM
Isabel C. Cameron Building Envelop Project Vail $344,767.50 02/12/14 Design U of H
Leroy and Lucille Melcher Hall Furniture Replacement Mathis $494,598.61 12/06/13 Construction Business
Leroy and Lucille Melcher Hall Restroom Upgrade Mathis $610,367.10 10/08/13 Construction Business
M.D. Anderson Library 509 Remediation Hazardous Flooring and New VCT Flooring Blue Wing Areas Tolbert $385,000 03/31/14 Scope Development Library
M.D. Anderson Library 509 Restroom Renovations Galvan $519,892 TBD 09/01/13 Library
Moody Towers Residence Halls 584 Hot Water Study Rahukar $956,015 09/26/13 Design Residence Life
Moore School of Music 520 Administration Wing Structural Slab Wheeler $1,200,000 09/30/13 Construction Music
Research Buildings: 505, 545, 550, 551, 579, 581, 593 EHS Safety Shower & Eyewash Installations Tolbert $364,890.75 01/27/14 Selection of Contractor Research Buildings
Science & Research 1 550 Elevator & Restroom Renewal Project Galvan $465,150 10/02/13 Selection of Contractor Science and Research
Science & Research 1 550 Lab 334 Buildout, new HVAC and flooring ANZI compliance Oliver $376,243 10/01/13 Construction Science and Research 1
Science & Research 1 550, Lamar Fleming, JR. 564 Professional & Construction Design/Build Services Tolbert $1,500,000 TBD Needs Development NSM
University of Houston Sugarland UHSL Driveway Wheeler $500,000 12/16/13 Design UHSL
Wortham Theatre 507 Alley Theatre Preparation Oliver $610,000 09/30/13 Design Liberal Arts
Wortham Theatre 507 Fine Arts Grove Warner $1,350,000 06/15/14 Design Liberal Arts
Wortham Theatre 507 Fire Sprinkler System Oliver $1,064,041 09/05/13 Construction Wortham Theatre

Last updated: 28 February 2014