Minor & Planned Projects Listing

Below is a listing of projects over $250,000 managed by Minor & Planned Projects. For a complete list of projects, contact Minor & Planned Projects at 713-743-5919.

To sort the columns click on the headers.
Building Project Proj. Manager Budget Subst. Comp Status Department
Alumni Center/Athletic Center 573/574 Replace Fire Alarms Simmons $490,572 2/25/13 Construction ALUM/ATH2
Bauer Honors Commons 528 Bauer Honors Renovation Galvan $490,000 Spring 2013 Selection of Contractor Business
Bayou Oaks Apartments 500 Bayou Oak Renovations Prochaska $1,700,000 7/22/2013 Selection of Contractor Residential Life & Housing
Campus Wide Life Safety Simmons $800,000 TBD Scope Development Campus
Computing Center 596 Install New Chilller 250T Simmons $433,125 5/30/13 Selection of Contractor Computing Center
Cullen College of Engineering 1 597 Fire Suppression Pump Installation Oliver $2,779,065 6/12/14 Design Engineering
Cullen College of Engineering 1&2,Science & Research 1, 2,University of Houston Science Center, J. Armistead, Science & Research Center/Classrooms 499 EHS Safety Shower & Eyewash Installations: In Seven (7) buildings (D-1/579, 550, 551, D-3/581, 593, 505 & 545) replace nonworking units and provide additional new units as required Tolbert $442,985 8/16/13 Selection of Contractor Research Buildings
Cullen College of Engineering 2 581 Dr. Yao Nano Lab Oliver $520,000 4/20/13 Construction Engineering
Energy Research Park 14B Superconducting wire pilot manufacturing facility Tolbert $651,000 TBD Construction Real Estate
Energy Research Park 15 Lab Buildout - Energy Device Fabrication Lab Tolbert $3,644,695 Phase I - TBD
Phase II - 8/30/2013
Construction Provost
Energy Research Park 8 ERP (Bldg.8) - Storage Building Improvements Tolbert $325,000 5/31/13 Construction ERP, Real Estate Services
Energy Research Park Annex 19A Building 19A - 1st Flr. Warehouse Annex Office Upgrade Tolbert $507,432 4/15/13 Selection of Contractor ERP
Farish Hall 587 Asian American Studies Suite Upgrade Vail $520,000 5/12/13 Design Asian Studies
Farish Hall 587 Restrooms Renovation Burks $368,451 03/30/13 Selection of Contractor FM
M.D. Anderson Library 509 MDA Library Sanitary Sewer Re-route Design Gill $500,000 4/30/13 Selection of Design Team FM
M.D. Anderson Library 509 Restroom Renovations Galvan $519,892 TBD TBD Library
Melcher Hall 528 Classroom Renovation Galvan $490,000 6/21/13 Selection of Contractor Business
Moody Towers Residence Halls 584 Hot Water Study Prochsaka $956,015 7/26/13 Design Residence Life
Moore School of Music 520 Administration Wing Structural Slab Wheeler $1,200,000 8/30/13 Construction Music
Optometry 505 Structural Design and Repair Laws $956,000 6/15/13 Construction Optometry
Science & Research 1 550 Dr. Kadry Bissada 1st flr. Lab. Renovations @ Rms. 103, 103A, 103B, 103C/105, 105A, 105B & 105C Oliver $727,990 7/30/13 Construction Natural Sciences & Mathematics
Science & Research 1 550 Elevator & Restroom Renewal Project Galvan $465,150 8/1/13 Selection of Contractor Science and Research
Science & Research 1 550 General Refresh Galvan $465,150 TBD TBD Natural Science and Mathematics
Science & Research 1 550 Lab 334 Buildout, new HVAC and flooring ANZI compliance Oliver $376,243 7/1/13 Design Science and Research 1
University of Houston Sugarland UHSL Driveway Olivarez $500,000 5/21/13 Design UHSL
Wortham Theatre 507 Alley Theatre Preparation Prochaska $610,000 6/25/13 Design Liberal Arts
Wortham Theatre 507 Fine Arts Grove Warner $1,000,000 8/28/13 Selection of Design Team Liberal Arts
Wortham Theatre 507 Fire Sprinkler System Prochaska $1,064,041 3/29/13 Construction Wortham Theatre

Last updated: 26 April 2013