CRDM Emergency Requests

FY2014

Project TitleRequest ByRequest DateCost EstimateCommittee ApprovalPrelim. Invest. Report
MD Anderson Library Fire / Life Safety Upgrades Kenneth Tolbert 8/30/2013 $56,576.42 Approved
Science Teaching Lab Building Fire / Life Safety Upgrades Kenneth Tolbert 8/30/2013 $36,145.52 Approved
SR1 (Science Bldgs) Fire / Life Safety Infrastruct. Repair Needs Kenneth Tolbert 8/30/2013 $63,375.28 Approved

FY2013

Project TitleRequest ByRequest DateCost EstimateCommittee ApprovalPrelim. Invest. Report
SR1 Fume Hood Exhaust Leak (Bldg 550) Bobby Galvan 8/4/2013 $69,986.12
GSB Toilet Room Upgrade, 1st floor Kimberly Burks 7/31/2013 $148,795.78
Hilton Galvanized Water Replacement Dave Laws 7/6/2013 $111,947.28
Farish Hall Restroom Renovation Kimberly Burks 6/24/2013 $224,669.45
EHS Safety Shower Eyewash Installation Emmett Sullivan 5/24/2013 $302,644.00
Technology Annex Building #503 FY'13 - Restroom Refresh Mike Burriello 5/14/2013 $139,920.00
Technology Annex Building #503 Cooridor Ceiling Tile Replacement Bobby Galvan 5/14/2013 $53,939.16
Request for Water Bottle Station Mike Burriello 5/14/2013 $83,422.00
General Service Building (585) Bathroom Renovations - Level 2
Science Research 1 (550) Lab 103/105 NFPA/101 and 45 Code Compliance Deficiencies Ken Oliver 3/17/2013 $64,754.34 Approved
General Service Building (585) Second Floor Abatement Anna Wiesman 1/25/2013 $49,570.00 Approved
Cameron (586) Air Handling Unit (AHU) Emergency Flue Pipe Installation David Laws 1/14/2013 $67,298.98 Approved
Wortham Theatre (507) Alley Theatre Preparation James Prochaska 10/22/2012 $157,311.00 Approved
College of Engineering (579) Renewal Engineering Labs S-346 & S-348 Steven Wright 10/22/2012 $51,154.40 Approved
Melcher Gym/Charter School (533) Dance Floor Installation Bobby Galvan 10/19/2012 $90,651.56 Approved
Wortham Theatre (507) Sprinkler Design James Prochaska 10/11/2012 $730,924.27 Approved
Computing Center (596) Construction of New 250 Ton Chiller and Chilled Water Main Header Barry Simmons 10/4/2012 $433,125.00 Approved
Campus Wide Fire Department Connection Hydrostatic Testing Barry Simmons 9/21/2012 $17,781.50 Approved
Science Research 2 (551) Tie-In Fire Pump to Emergency Generator Barry Simmons 9/21/2012 $30,432.60 Approved
Computing Center (596) Chiller Replacement Design Only Barry Simmons 9/14/2012 $6,762.80 Approved
Science Research 1 (550) Exhaust Duct and Fans Replacement Bobby Galvan 9/11/2012 $163,782.33 Approved View
Lamar Fleming (564) Transformer Repair Avinash Rahurkar 9/4/2012 $82,549.00 Approved View
Wortham Theatre (507) Urgent Request for Fire/Life Safety James Prochaska 10/16/2012 $730,924.37 Approved

FY2012

Project TitleRequest ByRequest DateCost EstimateCommittee ApprovalPrelim. Invest. Report
Cameron (586) Air Handling Unit Replacement Design Services David Laws 8/8/2012 $30,957.30 Approved
Cameron (586) Men’s Bathroom Remodel Project David Laws 7/3/2012 $62,840.31 Approved
Hilton (590) Life/Safety & Various Infrastructure Projects Craig Ness 6/25/2012 $1,757,668.00 Approved Doc 1
Doc 2
Krost Hall (539) Law Library Emergency Water Leak Repairs Ken Oliver 11/14/2011 $82,981.69 Approved

FY2011

Project TitleRequest ByRequest DateCost EstimateCommittee ApprovalPrelim. Invest. Report
Power Plant (515) Chiller 2A Motor Rewind Paul Robinson 3/14/2011 $147,890.00 Approved
Cullen Engineering (579) Fire Suppression Pump Installation Ken Oliver 3/2/2011 $379,065.75 Approved
Campus Wide Removal/ Replacement of Air Handler Coils / Feb. freeze 2011 Ken Oliver 2/22/2011 $356,895.00 Approved