Facilities Management: Enhancing the student experience
In contemplating the student experience on a
university campus, one often thinks in terms of student
orientation, academic coursework, social interactions, final
exams, and ultimately, graduation often forgetting the
importance of the physical built environment as part of that
experience. The University understands the impact the built
environment can have on student success and accomplishment and
as steward, the University works tirelessly to conserve,
sustain, and future plan for the universitys facilities and
grounds. Facilities Management plays a significant role in this
stewardship process. The following is a list of completed and
ongoing campus projects and initiatives focusing on cleaning,
lighting, space management, HVAC, plumbing, electrical, painting
and flooring, life safety and security, elevators, windows,
grounds, signage, and even the Koi pond.
| Total FM Projects Completed in 2012 |
54 |
| Total Number of FM Projects Ongoing |
48 |
| Total |
102 |
COMPLETED PROJECT HIGHLIGHTS
(June 2012 through November 2012)
Interior Projects
Classroom buildings project cleaning
Whiteboard and chalkboard replacement
Light bulb and fixture replacement and cleaning in all
classrooms
Cemo Hall Classroom/Auditorium Electrical Upgrades
Computing Center and General Services Building, Security
Access System Upgrade
College of Architecture, Room 435A Renovation
College of Architecture, Access Security Upgrade
Engineering 2, Room W345, Server Lab HVAC
Heyne classroom room 203
Hilton Continuing Education Renewal of all classrooms
Fine Arts classroom room 110
M.D. Anderson Library Red Wing new storefront entrance
Science Research I, room 607-G Convert lab to student study
room
Science Research I, room 128 Convert classroom to student
study room
Technology II classroom 105
M.D. Anderson Library room 106 Convert room for ADA student
use
Technology Install projection screens
SHRL TV Security Upgrade Installation of electronic security
devices
Moody Tower Computer Room Renovation Renovation of the Moody
Tower C-Store
Moody Tower Sanitary System Repair
Quadrangle Security Upgrades
M.D. Anderson Library Video Wall
Moody Tower Security Upgrade
SHRL Laundry Room Upgrades
Calhoun Lofts Apartment Terrance/Lounge Security Upgrade
Cougar Village Elevator Controls Upgrade
Moody Tower Elevator Modernization Phase I
Quadrangle HVAC Repairs
Campus Recreation Center
Clinical Research Center
Farish Hall Remodeling of existing Suite 112
Krost Hall Renovated existing book stack area
Exterior Projects
Fine Arts Refresh
Metal fencing and rails
Power washing of exterior campus way-finding signage
Fire hydrant and fire hose sites
Interior Campus Curb cut painting, weeding and cleanup near
curbs
Parking lot maintenance selective asphalt and concrete repair
and resurfacing
Campus fountain refreshing drained, cleaned and painted
fountains
General grounds and landscaping repairs Bare spots and cow
paths
Kiosk installation This project added five additional kiosk
locations
Trash can lid replacement
Campus Cleanup Day Event July event 100 faculty, staff and
student volunteers collected more than 732 pounds of waste, an
increase of 23% from last years event
Houston Science Center
University Center, Roof Repair
Houston Science Center
Install exterior bike racks College of Business
Calhoun Lofts Repair window leaks
Architecture library room 106 Install A.D.A. door operator
on entrance door
Trailer Village Temporary parking lot, located adjacent to
the Law Center
Temporary Parking Lot at Law Center Installed site lighting
for student safety/security
Y-Building Parking Convert Y-building concrete slab to temp
parking for students
Y-Building Deconstruction and Law Center Parking
PLANNED PROJECT HIGHLIGHTS
(Completion Winter 2012)
Interior Projects
Refresh Classroom buildings project cleaning
Classroom Count Furniture and Repair Review all classrooms
(general maintenance)
Furnish and Installation of projectors and related equipment
Cameron repair exterior faηade issues and prevent water
infiltration
Engineering Lecture Hall
Cameron Sound Abatement for rooms 103 and 105
Engineering Lecture Hall room W122
Moody Tower Conference Room Renovation
Wortham Theatre Fire Sprinkler Installation
Melcher Hall, Room 102 and 111 HVAC Upgrade
Student Services Center I & II and Health Center -- Fire Alarm
System Upgrade
M.D. Anderson Library
College of Business classroom podium modifications
M.D. Anderson Library pilot Lactation room/Mothers Room
Athletic Center
Melcher Gym/Charter School
SERC
Science and Research 1 Renovated Lab 41 for
equipment/research relocation
Science and Research 1 Renovating Labs 138/140
Farish Hall Restroom Renovation (anticipated completion:
March 2013)
Exterior Projects
College Of Technology ADA Automatic Door Installation
Architecture East Loading dock entry doors
Calhoun Lofts, Repair Roof Top Units (RTUs)
Refurbish Campus Directories: Frame repairs, replace
Plexiglas, maps, painting and cleaning
Campus wide: Numerous broken window replacement and repairs
ongoing for safety and appearance
Library Cow Path Repair: Install new plantings and repair
damaged turf for cow path
Miscellaneous Utility Landscape Repair: Repair areas disturbed
by utility repair work
Koi Pond Refresh
ONGOING FM MAINTENANCE AND
RENEWAL COMMITMENTS
Classroom Custodial Coordinator full-time classroom support
position will manage and track custodial facility inspections,
implement quality assurance processes, and oversee cleaning
projects starting in Spring 2013
Maintenance Technicians two full-time maintenance technicians
will provide classroom preventive maintenance, classroom
furniture repair, and level one (non-technical) repair services
Annual winter and summer classroom cleaning (summer full clean,
winter refresh) through the utilization of contracted cleaning
companies
Inventory and repair/replacement of broken or damaged classroom
furniture furniture inventory will be conducted during winter
break with repairs or replacement occurring as quickly as
possible thereafter
|